← Back to case studies

Software Validation

Manufacturing Data Intelligence System

Integration of production test stations with a centralized data system for yield visibility and serialized traceability.

HistorianTSMSDatabaseDashboardsSerialized Traceability
01

Problem

Production test data was distributed across stations, making it difficult to analyze yield trends, trace serialized unit history, or support investigations quickly.

02

Constraints

  • Data had to remain tied to serialized units and test station context.
  • Pass/fail and parametric results needed consistent structure.
  • Production teams needed faster yield and defect visibility.
  • The system had to support regulated investigation and traceability needs.
03

Engineering Decisions

  • Connected test stations to a centralized historian and test-system management structure.
  • Standardized pass/fail, parametric, and cycle-count logging.
  • Created data flows suitable for yield monitoring and defect Pareto analysis.
  • Designed traceability around unit identity and test context.
04

Validation

  • Verified data capture for pass/fail and parametric results.
  • Confirmed record retrieval by serialized unit.
  • Reviewed data consistency across stations and test cases.
05

Risk & Mitigation

  • Disconnected data could delay investigations; mitigated with centralized traceability.
  • Incomplete records could undermine quality decisions; mitigated through structured logging checks.
  • Uncontrolled data changes could affect reliability; mitigated through access and release controls.
06

Outcome

The system improved production visibility and enabled faster retrieval of unit-level test history for quality and manufacturing investigations.

Related domain: Software Validation

Review additional case evidence or contact VeraHex to discuss a similar engineering gap.