← Back to case studies

Automation & Testing

System 7 Battery PCBA ICT Fixture Qualification

IOQ execution and risk-controlled deployment of a custom ICT fixture used for production acceptance testing.

Medalist i3070ICT FixtureIOQKnown Good/Bad BoardsPerforce
01

Problem

A custom ICT fixture used for System 7 Battery PCBA production acceptance required objective evidence that it was installed correctly, operated as intended, detected known defects, and preserved data integrity.

02

Constraints

  • The fixture operated with a Medalist i3070 ICT system and supplier-provided test software.
  • Known good and known bad boards were required to challenge detection capability.
  • Production data retention and access control needed verification.
  • Certain operating procedures were draft-controlled and needed independent review.
03

Engineering Decisions

  • Used an integrated IQ/OQ structure to link installation controls to functional performance.
  • Verified barcode and autofile enforcement to prevent incorrect product testing.
  • Included grounding resistance and safety checks before production use.
  • Required independent review for executed evidence.
04

Validation

  • IQ verified documentation, environment, hardware, interfaces, training, and software installation.
  • OQ confirmed defect detection across PCB positions and repeated panel testing.
  • Cycle-time and data-retention requirements were verified against acceptance criteria.
05

Risk & Mitigation

  • Knowledge-loss risk was mitigated with training verification and controlled procedures.
  • Equipment damage risk was mitigated with grounding verification and controlled vacuum steps.
  • Data integrity risk was mitigated with access control and electronic record checks.
06

Outcome

The ICT fixture was qualified for production use with audit-ready evidence covering installation, operation, detection capability, cycle time, and data retention.

Related domain: Automation & Testing

Review additional case evidence or contact VeraHex to discuss a similar engineering gap.